| # | Model/Spec/Part No. | Description | CF | Pref | Notes |
|---|
Category
FA-M3 PLC
Subgroup | Page
Advanced Control Products | RANGE-FREE MULTI-CONTROLLER
SF900
Configuration
Parts/Accessories (separate line)
Notes
| Note Id | Description |
|---|---|
| 1 | Each rail mount kit is composed of three pieces. |
| 2 | Cannot be used together with a rail mount kit. |
| 3 | Takes one month (30 working days) for manufacturing lead-time. |
| 4 | Input response time 100 µs possible by configuration with F3SP28, F3SP38, F3SP53, F3SP58 and F3SP59. |
| 5 | Input response time 10 µs possible by configuration with F3SP28, F3SP38, F3SP53, F3SP58 and F3SP59. |
| 6 | A connector set is composed of a 40-pin connector and connector cover. |
| 7 | With output shut-off function for F3SP28, F3SP38, F3SP53, F3SP58, F3SP59, F3SP66 and F3SP67. |
| 8 | To use the F3LP02-0N or F3LP12-0N,-The sequence CPU module (F3SP21, F3SP25 or F3SP35) must be Revision 8 or later; and -The ladder diagram support program M3 must be Revision 1.08 or later. |
| 9 | To use the F3LR02-0N or F3LR02-1W, -The sequence CPU module (F3SP21, F3SP25 or F3SP35) must be Revision 8 or later; -The base module (F3BU04 or F3BU06) must be Revision 1 or later; and -The ladder diagram support program M3 must be Revision 1.08 or later. |
| 10 | A connector set is composed of a 48-pin connector and connector cover. |
| 12 | Takes 10 working days manufacturing lead-time. |
| 13 | Cannot be used with F3YP04, F3YP08, F3YP14, F3YP18, F3YP32, or F3YP34 |
| 14 | F3PUxx-0N and F3PUxx-0S have the same dimensions, internal circuitry and other characteristics, except that F3PUxx-0N uses M3.5-screw terminals while F3PUxx-0S uses M4-screw terminals. |
| 15 | Order entry stop from Nov. 30, 2005 |
| 16 | Order entry stop from June 30, 2006 |
| 17 | Order entry stop from Sep. 30, 2007 |
| 18 | Order entry stop from Nov. 17, 2006 |
| 19 | Driver software is different from KM13-1N. |
| 20 | Compatible with the following versions of software. - FA-M3 Programming Tool Widefield2 R4.01 or later - FA-M3 ToolBox for temperature Control and Monitoring Modules R4.01 or later - FA-M3 ToolBox for Positioning Modules R2.01 or later |
| 21 | Order entry stop from Feb. 26, 2008 |
| 22 | To use the F3CU04-0S, F3CU04-1S - ToolBox Temperature Control and PID Module must be revision 4.02 or later. |
| 23 | The specifications are the same as F3CU04-xN, new model is improved the limitation of current output. When parameters are changed and necessary to be saved with F3CU04-xN, application program to save the parameters are required. |
| 24 | Order entry stop on Sep. 30, 2008 |
| 25 | Order entry stop on Jan. 24, 2009 |
| 26 | The price was changed from Nov. 1, 2007 |
| 27 | Order entry stop on Sep.30, 2009 |
| 28 | Order entry stop on May 19, 2009 |
| 29 | Order entry stop on Dec. 22, 2010 |
| 30 | Compatible with the following versions of software - FA-M3 Programming Tool Widefield2 R5.03 or later - FA-M3 ToolBox for temperature Control and Monitoring Modules R4.03 or later - FA-M3 ToolBox for Positioning Modules R2.03 or later |
| 31 | Compatible with the following versions of software - FA-M3 Programming Tool WideField3 R1.01 or later - FA-M3 ToolBox for temperature Control and Monitoring Modules R5.01 or later - FA-M3 ToolBox for Positioning Modules R3.01 or later |
| 32 | Order entry stop from Sept. 30, 2012 |
| 33 | Order entry stop from Jul. 27, 2013 |
| 34 | Order entry stop from Jan. 31, 2015 |
| 35 | Takes 3 working days for manufacturing lead-time. |
| 36 | Takes 10 working days for manufacturing lead-time. |
| 37 | TOKUCHU is required when KM80-300/ KM81-300 is ordered. |
| 38 | Takes 30 days working for manufacturing lead-time. |
| 39 | Cannot be used for the F3YP04 or F3YP08 positioning module since it requires a 48-pin connector. Takes 10 working days for manufacturing lead-time. |
| 40 | Takes 7 working days for manufacturing lead-time. Caution: Unlike general cabling work, laying cables (KM61, KM62, KM65 and KM67) requires professional knowledge and skills. We recommend that you engage a subcontractor that specializes in fiber-optic cable laying. Before laying cables, customer should check the cables (immediately after delivery) for any defect. |
| 41 | Each rail mount kit is composed of three pieces. |
| 42 | Cannot be used together with a rail mount kit. |
| 43 | Takes one month (30 working days) for manufacturing lead-time. |
| 44 | Input response time 100 µs possible by configuration with F3SP28, F3SP38, F3SP53, F3SP58 and F3SP59. |
| 45 | Cannot be used for the F3YP04 or F3YP08 positioning module since it requires a 48-pin connector. Takes 10 working days for manufacturing lead-time. |
| 46 | Contact Product Management for details on availability and pricing. |
Add Item to Quote
Please select atleast one item to proceed.
Configuration Error
Selected configuration is not valid. Please read notes and make corrections.
Loading...