Specify the Model Number, add the Materials of Construction, Process Connection, Electrode Cables, Electrodes, Temperature Sensor Code Selections to the Model Number and total the prices to arrive at list price.
Product Notes
All necessary electrodes, cables and fittings are included.
If a Material Certificate is required, all parts have to be ordered as individual line items with a /M at the end of the holder part number. There is a 6-8 week lead time (ARO) as it has to be ordered from Europe and an additional $54 charge. C/F
Notice
SAP requires an A to be added in front of FF20/FS20/FS20 matrixes on the price pages. However, you can continue to place sales orders as before, just the FF20; FS20 or FD20.
Add Item to Quote
Please select atleast one item to proceed.
Configuration Error
Selected configuration is not valid. Please read notes and make corrections.
Email Verification Required
Email Verification link has been sent successfully.
Please follow instruction in email to verify